Non-performance defence (Art. 1219 French Civil Code): suspending payments without slipping into wrongful termination

An IT service provider delivers a module that does not meet the specifications and invoices the next instalment. A supplier halves its deliveries without explanation. A commercial landlord lets a unit deteriorate, and the tenant now disputes its peaceful enjoyment. In all three situations, the reflex of the manager or finance director is the same: stop paying to create leverage. That reflex has a legal basis, but it exposes anyone who exercises it badly to having the termination attributed to them, with compensation payable. This analysis covers the conditions of the defence of non-performance (exception d'inexécution), the formalities the texts actually require, and the decision timetable to follow between the first incident and exit from the contract.

What Article 1219 of the French Civil Code exactly allows

The defence of non-performance is among the remedies open to a dissatisfied creditor under Article 1217 of the French Civil Code, which allows a party to refuse to perform or suspend performance of its own obligation. Its regime is set out in a single sentence:

A party may refuse to perform its obligation, even though it is due, if the other party does not perform its own and if that failure is sufficiently serious.

Three lessons can be drawn from this wording. First, suspension applies even though the obligation is due: a creditor who suspends is not late, it is exercising a right. Second, only two conditions are required, the other party's non-performance and its sufficient seriousness. Third, Article 1219 presupposes a failure that has already occurred, been established and is ongoing. It does not govern the fear of a future default.

The separate regime of anticipatory suspension

Article 1220 deals with a different situation and has its own conditions. Suspension is available where it is clear that its counterparty will not perform when due and that the consequences of that non-performance are sufficiently serious for it. Seriousness is therefore not assessed in the same terms as under Article 1219: it does not concern the non-performance itself, which has not yet occurred, but the foreseeable consequences for the party that suspends. A criterion of certainty is added, namely that the announced default must be clear, which rules out mere financial concern fed by a market rumour or a credit downgrade.

The distinction has direct operational consequences. A principal who learns that its subcontractor has abandoned the site and dismissed its teams is on the ground of Article 1220. One who notes a first non-conforming delivery is on the ground of Article 1219. The evidence to be assembled is not the same: in the first case it is necessary to show that the future default is evident and how large the feared loss is, in the second that non-performance has already occurred and how serious it is.

Particular statutory applications

The French Civil Code contains older versions of this mechanism. In sales, Article 1612 relieves the seller of the obligation to deliver the thing if the buyer does not pay the price and no time for payment has been granted. Symmetrically, Article 1653 allows a buyer who is disturbed, or who has good reason to fear being disturbed by a mortgage claim or a claim of ownership, to suspend payment of the price until the seller has put an end to the disturbance. This last text expressly reserves two counter-measures to the seller: providing a guarantee, and a contrary stipulation providing that the buyer will pay notwithstanding the disturbance. For a buyer of a property asset, reading this clause in the preliminary agreement is therefore a prerequisite to any decision to withhold the price.

In leases, the interplay is found between Article 1719, which requires the landlord to deliver the thing, to maintain it in a condition fit for the intended use and to ensure the tenant's peaceful enjoyment of it, and Article 1728, which requires the tenant to pay the rent on the agreed dates. A tenant who suspends its rent relies on a breach of the former to free itself from the latter. The landlord's breach must still reach the required degree of seriousness, which is the real ground of the debate.

Sufficient seriousness: a standard without a scale

No text defines what a sufficiently serious failure is. The criterion is a matter for the discretion of the trial courts, having regard to the economics of the contract, the importance of the obligation breached and the concrete effect of the breach on the creditor's interest. There is no threshold in terms of months of unpaid rent, nor any percentage of defective services above which suspension would be safe. Any decision-maker who reasons on the basis of such a scale reasons wrongly.

Two additional parameters, built by case law, frame the exercise of the right. The first is good faith, required by Article 1104 of the French Civil Code in the performance of the contract, a provision expressly described as public policy. The second is proportionality between the part suspended and the seriousness of the breach. Neither appears in the text of Article 1219, but they structure judicial review: a party that suspends all of its payments for a breach affecting a marginal fraction of the service risks having the suspension held abusive, and so becoming the defaulting debtor itself.

The practical consequence is clear. Suspension of payments under a contract must be segmented and reasoned item by item. A project owner faced with reservations on a technical package is better advised to suspend the portion of the price corresponding to that package rather than the whole of a progress payment, and to write down that reasoning before relying on it.

The formalities actually required, and those that prudence imposes

On this point, the texts are often misread. Article 1219 requires neither prior formal notice nor notification of the suspension. A party suffering a serious failure may, in law, stop performing without notice. By contrast, Article 1220 imposes one formality, and only one: the suspension must be notified as soon as possible. An anticipatory suspension that is not notified is therefore open to challenge on that ground alone, regardless of the merits.

This asymmetry must not lead to carelessness within the scope of Article 1219. The burden of proof will fall on the party that suspended, and silence is the worst choice here. A prior formal notice (mise en demeure), sent in the form required by Article 1344 of the French Civil Code, that is, by a summons or an act containing a sufficient demand, fulfils three functions: it dates the non-performance, it fixes its scope, and it deprives the counterparty of the argument of surprise. It is not a condition of the validity of the suspension, it is its proof. Contracts providing that formal notice results from the mere fact that the obligation is due, a situation also covered by Article 1344, dispense with this formality without dispensing with a written record of the decision. On the comparative effects of a simple letter, a registered letter and an instrument served by a commissaire de justice (bailiff), see our analysis of formal notice served by a commissaire de justice.

One question remains that the texts reviewed do not settle: the validity of clauses waiving the defence of non-performance, of "pay first, dispute afterwards" stipulations, or of clauses requiring payment notwithstanding a dispute. No general provision settles whether Article 1219 is a default rule. Only Article 1653, in sales, expressly reserves a contrary stipulation. The presence of such a clause in the contract radically changes the exposure to risk and must be analysed before any decision to suspend.

The decision timetable, from the first incident to exit

Step one: check the law applicable to the contract

Article 9 of Ordinance No. 2016-131 of 10 February 2016, as amended by the Law of 20 April 2018, provides that contracts concluded before 1 October 2016 remain subject to the former law, including as regards their statutory effects and provisions of public policy. A commercial lease signed in 2014 and renewed by tacit renewal, an old framework distribution agreement, a concession concluded before the reform all fall under the earlier case-law regime. Citing Article 1219 of the French Civil Code in a formal notice concerning a 2013 contract is a technical error that the defence will exploit immediately. The first check is therefore the date of conclusion, not the content of the complaint.

Step two: characterise and document the contractual non-performance

This means identifying the precise obligation breached, by reference to the clause of the contract or the default statutory provision, then gathering the material evidence: reports, acceptance minutes with reservations, non-conformity reports, records of late delivery, written exchanges. For an institutional landlord facing a tenant who relies on a failure to maintain in order to suspend its rent, building an adversarial technical file, where appropriate by way of an expert appointment in summary proceedings (référé-expertise), is the best way to bring the debate back to the question of seriousness.

Step three: the formal notice, and the choice of its scope

A formal notice does not have a single scope. One that prepares specific performance under Article 1221 or replacement by a third party under Article 1222 does not have the same content as one that prepares unilateral termination. This choice must be made before drafting, because Article 1226 requires a specific statement whose omission ruins the later termination procedure.

Step four: suspend in a proportionate and written manner

The decision to suspend is notified, even where Article 1219 does not require it, stating the obligation not performed, the exact scope of what is suspended, and the automatic resumption of payments if the position is regularised. This last statement is decisive: it shows that the suspension is a protective measure and not a threat, and that its purpose is not to end the contract.

Step five: choose the exit route

Article 1224 opens only three routes: the termination clause, notification in the event of sufficiently serious non-performance, and a court decision. The choice between them is a trade-off between speed and security.

Unilateral termination and the risk of reversed fault

Article 1226 allows the creditor to terminate the contract by notification, but it does so at its own risk. The text requires four steps, in this order.

  • Unless the matter is urgent, a prior formal notice to the defaulting debtor to perform its undertaking within a reasonable time.
  • This formal notice expressly states that, if the debtor fails to perform its obligation, the creditor will be entitled to terminate the contract.
  • Where the non-performance persists, the creditor notifies the debtor of the termination and the reasons for it.
  • The debtor may at any time apply to the court to challenge the termination, and the creditor must then prove the seriousness of the non-performance.

The burden of proof is thus entirely reversed to the detriment of the party that terminated. If seriousness is not established, the court may, under Article 1228, record or order termination, order performance of the contract while possibly granting the debtor a period of grace, or award damages only. In other words, a poorly calibrated unilateral termination becomes a non-performance attributable to its author, sanctioned under Article 1231-1, which orders the debtor to pay damages for non-performance or delay, unless it shows that performance was prevented by force majeure within the meaning of Article 1218. This is the reversed-fault scenario: the creditor becomes the defendant and pays.

Where the case on seriousness is fragile, the prudent route remains that of Article 1227, under which termination may in any event be sought from the court, the contract continuing to take effect until the decision.

Termination clause and notification are not the same

Article 1225 makes the operation of the termination clause subject to three requirements: the clause must specify the undertakings whose non-performance will lead to termination of the contract, an unsuccessful formal notice must precede it unless it was agreed that it would result from the mere fact of non-performance, and this formal notice takes effect only if it expressly refers to the termination clause. A termination clause drafted in general terms, covering "any non-performance", loses much of its effectiveness. Invoking a termination clause in a letter that does not cite it amounts to having done nothing.

Effective date and survival of clauses

Article 1229 fixes the effective date of the termination: the conditions laid down in the termination clause, the date on which the debtor receives the creditor's notification, or the date fixed by the court and, failing that, the day of the summons. Where the performances exchanged have been of use as reciprocal performance proceeded, as is the case for leases and distribution contracts, there is no restitution for the earlier period and the termination is characterised as a termination for the future (résiliation). Finally, Article 1230 preserves clauses on the resolution of disputes and those intended to take effect even on termination, such as confidentiality and non-competition clauses: a jurisdiction or arbitration clause survives the termination, which determines the forum for any later litigation.

The areas where suspending payments is a trap

Commercial leases: the new wording of Article L145-41

Article L145-41 of the French Commercial Code, in the wording resulting from Law No. 2026-403 of 26 May 2026, maintains the classic mechanism: the termination clause takes effect only one month after a payment order (commandement) that has gone unanswered, the order having to mention this period on pain of nullity. But the text adds a condition that significantly changes the balance between landlord and tenant:

The grant of time to pay and the suspension of the effects of the termination clause for non-payment of rent are, moreover, conditional on the tenant's ability to pay the rent debt and on the resumption of payment of the current rent in full before the date of the first hearing.

This condition applies to applications for suspension of the effects of the termination clause made from the entry into force of the law. For a tenant who suspends its rent by relying on a breach by the landlord, the exposure becomes harsher: if it fails to have the seriousness of the breach recognised, it will have to show, in order to obtain time to pay under Article 1343-5 of the French Civil Code, that it can clear the debt and that it has resumed payment of the current rent in full before the first hearing. For the institutional landlord, the decision timetable tightens around the payment order invoking the termination clause, the drafting quality of which governs the whole litigation.

Established commercial relationships: Article L442-1 after the Law of 18 August 2026

Suspending orders from a partner is not neutral. Paragraph II of Article L442-1 of the French Commercial Code, in the wording resulting from Law No. 2026-796 of 18 August 2026, penalises the sudden termination, even partial, of an established commercial relationship without written notice. The text now expressly covers the act of implementing a substantial reduction, in the course of negotiating a contract, in the volumes of orders sent to a commercial partner, including where it is temporary in nature, where it is likely, by its scale, its unusual character or the conditions in which it occurs, to compromise the balance of the relationship. A suspension presented as temporary may therefore be recharacterised. The conditions of this liability and the calculation of the notice period are dealt with separately in our article on sudden termination of established commercial relationships.

Two safeguards remain. The same paragraph II specifies that its provisions do not prevent termination without notice in the event of the other party's failure to perform its obligations or in the event of force majeure. The quality of the non-performance case thus becomes the main line of defence against a claim for sudden termination. In addition, the liability of the party that terminated cannot be engaged on the ground of insufficient duration where it has given eighteen months' notice.

Collective proceedings: neutralisation of the defence

Paragraph I of Article L622-13 of the French Commercial Code provides that, notwithstanding any statutory provision or contractual clause, no termination or cancellation of a contract in progress may result solely from the opening of safeguard proceedings (sauvegarde), and that the counterparty must perform its obligations despite the debtor's failure to perform undertakings made before the opening judgment, that failure giving rise only to a claim in the insolvency. The defence of non-performance based on sums unpaid before the opening judgment is therefore neutralised in this setting. A supplier that suspends its deliveries after safeguard proceedings have opened, on the ground of earlier unpaid invoices, is exposed. The regime applicable in reorganisation (redressement) and liquidation follows its own cross-referring texts, which must be checked case by case before any decision.

Payment periods and unforeseeability

Suspending payments to suppliers carries an administrative risk separate from the contractual risk. Article L441-16 of the French Commercial Code punishes failure to respect the statutory payment periods with an administrative fine of up to €75,000 for an individual and €2 million for a legal entity, rising to €150,000 and €4 million where the breach is repeated within two years. The text prohibits, under the same penalties, any clauses or practices having the effect of abusively delaying the start of the payment periods. A policy of systematically withholding payments, even dressed up as a defence of non-performance, reads as a practice of late payment.

Lastly, the defence of non-performance must not be confused with unforeseeability (imprévision). Article 1195 of the French Civil Code, which allows renegotiation to be requested where an unforeseeable change in circumstances makes performance excessively onerous, specifies that the party invoking it continues to perform its obligations during the renegotiation. A manager who suspends payments because its costs have risen is not within Article 1219 and is in a position of non-performance. The regime of Article 1195 and the drafting of hardship clauses are set out in our article on unforeseeability in B2B contracts.

The alternatives to suspension in the balance of options

Suspension is not always the most effective lever. Article 1221 allows specific performance, after formal notice, unless performance is impossible or there is a manifest disproportion between its cost to the debtor in good faith and its benefit to the creditor. Article 1222 allows the creditor, after formal notice, to have the obligation performed itself within a reasonable time and at a reasonable cost, and to claim reimbursement, or even to ask the court for an advance of the necessary sums. This route is often preferable for a project owner who needs the works to progress rather than leverage.

Article 1223, in the wording resulting from the Law of 20 April 2018, applicable to legal acts concluded or drawn up from its entry into force, provides for a price reduction in the event of imperfect performance: prior formal notice, no full or partial payment, notification of the decision to reduce as soon as possible, the debtor's acceptance having to be in writing, and application to the court if the creditor has already paid. It is the cleanest way out of a dispute over a partially defective service where the relationship must continue.

These remedies are not mutually exclusive. Article 1217 provides that remedies which are not incompatible may be combined; damages may always be added to them.

Conclusion

The defence of non-performance is a legitimate instrument of pressure, but it is an evidential instrument before it is an economic one. A party that suspends its payments builds, by that very act, the file that will be judged: the characterisation of the contractual non-performance, the proportionality of the amount suspended, the traceability of the decision. The slide into wrongful termination almost never comes from the principle of suspension, it comes from its excessive scope, its indefinite duration, or a unilateral termination notified without the formal notice having expressly mentioned the risk of termination.

Before any suspension, three checks should be settled in writing: the date the contract was concluded, to know whether Articles 1219 and 1220 apply to it; the existence of a clause requiring payment notwithstanding a dispute or waiving the defence; and the counterparty's position with regard to any collective proceedings in progress. These three points determine the real exposure, well before the debate on seriousness.

Frequently asked questions

Is formal notice required before invoking the defence of non-performance?

Article 1219 of the French Civil Code requires neither formal notice nor prior notification: it requires only a failure by the other party that is sufficiently serious. Formal notice is therefore not a condition of the validity of the suspension, but a decisive evidential precaution, since the burden of showing seriousness will fall on the party that suspended. It will be sent in the form required by Article 1344, by summons or an act containing a sufficient demand. By contrast, the anticipatory suspension under Article 1220 must be notified as soon as possible.

What is the difference between Article 1219 and Article 1220 of the French Civil Code?

Article 1219 presupposes a non-performance that has already occurred and is sufficiently serious, and allows a party to refuse to perform its obligation even though it is due. Article 1220 concerns future non-performance: it must be clear that the counterparty will not perform when due and that the consequences of that non-performance are sufficiently serious for the party that suspends. Seriousness is therefore not assessed on the same object in the two texts. Only Article 1220 requires notification of the suspension.

Can a tenant suspend its rent if the landlord does not maintain the premises?

Under Article 1719 of the French Civil Code, the landlord must maintain the thing in a condition fit for the use for which it was let and ensure the tenant's peaceful enjoyment of it, while Article 1728 requires the tenant to pay the rent on the agreed dates. Suspension is accepted only if the landlord's breach reaches the required degree of seriousness, assessed at the trial courts' discretion. Since Law No. 2026-403 of 26 May 2026, the grant of time to pay and the suspension of the effects of the termination clause are conditional on the tenant's ability to pay the rent debt and on the resumption of payment of the current rent in full before the first hearing. The risk for a tenant who fails is therefore increased.

Can suspending orders amount to sudden termination within the meaning of Article L442-1?

Yes. Paragraph II of Article L442-1 of the French Commercial Code, in the wording resulting from Law No. 2026-796 of 18 August 2026, penalises sudden termination, even partial, of an established commercial relationship and expressly covers a substantial reduction in order volumes, including a temporary one, where it is likely to compromise the balance of the relationship. The same text nevertheless reserves the right to terminate without notice where the other party fails to perform its obligations or in the event of force majeure. The quality of the non-performance case is therefore the main defence. In addition, liability cannot be engaged on the ground of insufficient duration if eighteen months' notice has been given.

Can the defence of non-performance be raised against a debtor in collective proceedings?

No, in the case of sums unpaid before the opening judgment of safeguard proceedings. Paragraph I of Article L622-13 of the French Commercial Code provides that no termination or cancellation of a contract in progress may result solely from the opening of the proceedings and that the counterparty must perform its obligations despite the debtor's failure to perform earlier undertakings, that failure giving rise only to a claim in the insolvency. The regime applicable in reorganisation and liquidation rests on separate cross-referring texts, which must be checked before any decision to suspend.

What does a business risk if it wrongly suspends payments to suppliers?

It becomes the defaulting debtor itself and is exposed to damages under Article 1231-1 of the French Civil Code, for non-performance or delay, unless it can show force majeure within the meaning of Article 1218. It is also exposed to its counterparty starting termination, or even to having the termination attributed to it. A B2B-specific administrative risk is added: Article L441-16 of the French Commercial Code provides for an administrative fine of up to €75,000 for an individual and €2 million for a legal entity, rising to €150,000 and €4 million where the breach is repeated within two years.

Can a contract be terminated without going to court?

Yes, Article 1224 of the French Civil Code allows termination by notification in the event of sufficiently serious non-performance, but Article 1226 specifies that the creditor acts at its own risk. Unless the matter is urgent, it must give the debtor formal notice to perform its undertaking within a reasonable time, this notice expressly stating that otherwise it will be entitled to terminate the contract, then notify the termination and the reasons for it. The debtor may at any time apply to the court, and the creditor must then prove the seriousness of the non-performance. Where that case is fragile, Article 1227 allows termination to be sought from the court in any event.

Votre situation ressemble-t-elle à celle-ci ?

Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.

Décrire ma situation
Sans engagement – réponse du cabinet sous quarante-huit heures ouvrées.
• Vous êtes concerné ?

A dispute between shareholders that is dragging on?

A contested decision, information withheld, a director who overrides the others: the time to react is counted in months, sometimes in weeks.

societes
non-performance-defence-art-1219-suspending-payments-wrongful-termination
Questionnaire
×
Merci, votre demande est bien parvenue au cabinet. Une réponse vous sera adressée sous quarante-huit heures ouvrées.
L’envoi n’a pas abouti. Vous pouvez écrire directement à contact@avocats-gloria.com.

Vos réponses aux questions précédentes sont jointes à votre message. Réponse sous quarante-huit heures ouvrées.

Ces questions ne constituent pas une consultation juridique et ne remplacent pas l’examen de vos pièces. Les informations transmises servent uniquement à répondre à votre demande et ne sont pas cédées à des tiers.