An investor acquiring a let office building, an institutional landlord negotiating a renewal, a chief financial officer (DAF) choosing between two locations: all run into the same question, which is rarely addressed before signing. Who declares the consumption data on the digital platform of the tertiary energy-efficiency scheme, who bears the cost of the reduction works, and who answers for a failure if the 2030 target is not met? The French Construction and Housing Code (Code de la construction et de l'habitation, CCH) does not designate a single debtor: it expressly refers to the terms of the lease. In other words, a lease that is silent or poorly drafted creates a contractual grey area that will have to be paid for at the time of an inspection, a resale or the fixing of the eviction indemnity. This guide sets out how the reporting burden and the burden of the works are divided between landlord and tenant, the public-policy limits of the commercial lease regime (statut des baux commerciaux), and the effect of that allocation on the usability and value of a tertiary asset.
Liability shared by design: what Article L. 174-1 CCH says
The scheme rests on Article L. 174-1 of the French Construction and Housing Code, which derives from the ELAN Act and was then amended by Article 176 of Act No. 2021-1104 of 22 August 2021, known as the Climate and Resilience Act. Its detailed rules appear in Articles R. 174-22 to R. 174-32 of the same code. Two points of codification need to be made at the outset, because they still circulate in older clause banks: the former Articles L. 111-10-3 and R. 131-38 et seq. were renumbered when the CCH was recodified, and Article L. 174-2 CCH does not concern the tertiary decree but the individualisation of heating costs in collective residential buildings.
Article L. 174-1, I, sets the target: a reduction in final energy consumption of at least 40% in 2030, 50% in 2040 and 60% in 2050 against a reference consumption that may not predate 2010, or, as an alternative, the attainment of a level of final energy consumption fixed in absolute terms by reference to the consumption of new buildings of the same category. The Climate and Resilience Act added a structuring constraint for technical choices: the actions may not lead either to an increase in the use of non-renewable energy or to an increase in greenhouse gas emissions. A purely accounting substitution of energy source, intended to lower the final kWh figure without addressing carbon, is therefore ruled out.
Part II of Article L. 174-1 carries the whole contractual stake.
The owners of buildings or parts of buildings and, where applicable, the tenants are subject to the obligation provided for in I for the actions that fall within their respective responsibilities by virtue of the contractual provisions governing their relationship. They define together the actions intended to comply with this obligation and implement the corresponding means, each as far as it is concerned, in accordance with the same contractual provisions.
Three operational consequences follow. First, liability is not alternative but cumulative: the owner and the tenant are both subject to the obligation, each for its own scope. Second, the boundary between those scopes is not fixed by statute but by the lease. Third, the text requires a joint approach to defining the actions, which presupposes a contractual or quasi-contractual framework for organising that consultation. The same Part II adds that each party shall transmit annually the energy consumption of the buildings or parts of buildings concerning it, in order to monitor compliance with its obligation.
The scope of liability: a 1,000 m² threshold assessed at site level
Article R. 174-22 CCH defines the field of application. The following are subject to the obligation: owners and, where applicable, tenants of any building housing exclusively tertiary activities on a floor area of 1,000 m² or more; of any parts of a mixed-use building housing tertiary activities on a cumulative floor area of 1,000 m² or more; and of any group of buildings located on the same land unit or the same site where those buildings house tertiary activities on a cumulative floor area of 1,000 m² or more. Floor area is understood within the meaning of Article R. 111-22 of the French Urban Planning Code.
The cumulation rule is the first due diligence trap. A tenant occupying a few hundred square metres may be caught because the property as a whole exceeds the threshold. An investor who reasons lot by lot, without reconstituting the land unit, mechanically underestimates its reporting scope. The text also specifies that floor areas devoted to non-tertiary activities ancillary to tertiary activities are taken into account for the purposes of liability.
A second point, often overlooked in asset restructurings: liability is not lost by a reduction in floor area. Where tertiary activities cease, the owners and, where applicable, the tenants who continue to carry on tertiary activities there remain subject to the obligation even if the cumulative floor area falls below 1,000 m². The same applies to those who carry on an additional tertiary activity after such a cessation. Prolonged partial vacancy therefore does not take the building out of the scheme.
Part III of Article R. 174-22 excludes only three categories: constructions for which a temporary building permit has been granted within the meaning of Article R. 433-1 of the French Urban Planning Code, buildings intended for worship, and those in which an operational activity is carried on for purposes of defence, civil security or internal state security. There is no general exemption based on the age of the building or the status of the owner.
The annual declaration: who makes it, what it contains, what can be delegated
The party responsible for the declaration is designated by the lease
Article R. 174-28 CCH is the central text for the contractual angle:
The annual declaration of energy consumption on the digital platform is made by the owner or by the tenant, according to their respective responsibility under the contractual provisions governing their relationship, and within the framework of the provisions on access rights to the digital platform.
The digital platform is the one provided for in 4° of Part III of Article L. 174-1, set up by the State or, under its supervision, by an operator designated by order of the ministers responsible for construction and energy; in practice it is known as OPERAT. The rules on access rights, transmission, use and return of data are set by order, the data being made anonymous and its use respecting business confidentiality (Article R. 174-30 CCH).
The content of the declaration and the annual deadline
Article R. 174-27 CCH lists what the owner and, where applicable, the tenant must declare: the tertiary activity or activities carried on, the floor area concerned, annual energy consumption by type of energy, where applicable the reference year and the associated reference consumption together with the corresponding supporting documents, the intensity-of-use indicators relating to the activities housed, any adjustments (modulations), and the recording of consumption linked to the charging of electric or plug-in hybrid vehicles.
On the date, a clarification is needed, because many lease clauses still reproduce the former wording of the text. Since Decree No. 2021-1271 of 29 September 2021, Article R. 174-27 provides only that this data is transmitted each year by deadlines set by a joint order of the ministers responsible for construction and energy. The reference to a deadline of 30 September no longer appears in the regulatory part of the CCH. A lease clause that fixes a date in the contractual text runs the risk of a mismatch with the applicable order: it is better to refer dynamically to the deadline set by the order in force, adding to the clause an internal deadline for handing the data to the declarant, several weeks before that deadline.
Delegating the transmission is not transferring the responsibility
Article R. 174-28 allows those subject to the obligation to delegate the transmission of their energy consumption to a service provider or, subject to their technical capacity, to energy distribution network operators. It specifies that the tenant may delegate this data transmission to the owner.
The wording deserves a strict reading. What the text allows to be delegated is the transmission. It does not state that the delegation transfers to the delegate the liability itself, which arises from Article L. 174-1, II, and from the contractual allocation. For an institutional landlord that centralises the declaration for an entire multi-tenant property, the practical consequence is as follows: centralisation is a service rendered, it does not absorb the tenant's obligation and, conversely, it creates an exposure specific to the landlord if the data transmitted by the occupiers is late, incomplete or erroneous. The clause must therefore distinguish three matters: the event giving rise to the obligation, the material performance of the transmission, and contractual liability for default by one towards the other.
The reciprocal disclosure obligation: the operational friction point
The third paragraph of Article R. 174-28 sets out a cross obligation: owners and tenants communicate to each other the actual annual energy consumption of all the equipment and systems that they respectively operate.
This obligation is the logical counterpart of the allocation under Article L. 174-1, II. The landlord generally controls the consumption of shared equipment, heat and cooling production, ventilation, lifts, lighting of common areas. The tenant controls consumption linked to its own operations, processes, IT, lighting and private equipment. Neither has on its own all the data needed for a consistent declaration, or for determining a defensible reference consumption.
The contractual wording must be precise: format and granularity of the data, measurement source used, frequency of delivery, designated contact, and above all traceability of delivery. In any later dispute, the party that cannot establish that it requested and then chased the other will be at a disadvantage. As the obligation is reciprocal, one party's silence does not automatically release the other.
For the premises concerned, this obligation is added to the environmental annex under Article L. 125-9 of the French Environmental Code. That annex is mandatory for leases concluded or renewed covering premises of more than 2,000 square metres used as offices or shops. The threshold must not be confused with the 1,000 m² threshold of the tertiary scheme: a lease of 1,200 m² of offices falls within the tertiary decree without falling within the mandatory environmental annex. This annex provides that tenant and landlord communicate to each other all useful information on the energy consumption of the let premises, that the tenant allows the landlord access to the let premises to carry out works improving energy performance, and that it may provide for obligations on tenants to limit energy consumption. Nothing prevents the parties, in leases not subject to the 2,000 m² threshold, from voluntarily stipulating an annex of the same kind: it is the most suitable contractual vehicle for organising the consultation that Article L. 174-1, II, requires without specifying how. The content of this annex and the allocation of energy capex between landlord and tenant are covered in our article on the environmental annex to the green lease.
The burden of the works: where contractual freedom ends in a commercial lease
Reaching the 2030, 2040 and 2050 stages requires, in most older assets, work on the building envelope, the systems and the controls. This is where the contractual allocation meets a public-policy limit.
For leases concluded or renewed since the entry into force of Decree No. 2014-1317 of 3 November 2014, Article R. 145-35 of the French Commercial Code prohibits charging to the tenant the costs of major repairs (grosses réparations) referred to in Article 606 of the French Civil Code, together with the fees connected with carrying them out, and the costs of works intended to remedy obsolescence or to bring the let property or the building in which it is located into compliance with regulations, where they fall within the major repairs referred to in the preceding paragraph.
The wording calls for a rigorous reading, one often distorted in negotiations. The exclusion of compliance works is not general: it applies where they fall within the major repairs. The classification of energy renovation works under Article 606 of the French Civil Code is therefore decided operation by operation, according to the nature of the structure affected. Replacing an air-handling unit, reworking a façade, insulating a roof or replacing a heat generator does not call for the same analysis as relamping, terminal regulation or installing metering equipment. A landlord who includes a general clause transferring all regulatory compliance works without distinction runs the risk of seeing that clause deprived of effect for the part falling within Article 606. On the distinction between major repairs and tenant's repairs, see our analysis of Article 606 of the French Civil Code in commercial leases.
Article L. 145-40-2 of the French Commercial Code also requires every lease to contain a precise and exhaustive inventory of the categories of charges, taxes, duties and fees linked to the lease, with an indication of how they are allocated between landlord and tenant. The exhaustive nature is decisive: a category of expenditure not listed in the inventory cannot be recovered. The recurring costs generated by the tertiary scheme, data collection and verification, reporting services, maintenance of instrumentation, must therefore be expressly listed if the landlord intends to re-invoice them, within the limits set by Article R. 145-35.
The same Article L. 145-40-2 requires the landlord, when the lease is concluded and then every three years, to give each tenant a forecast statement of the works planned over the following three years together with a forecast budget, and a summary statement of the works carried out over the preceding three years with their cost. This three-year statement is the natural vehicle for the building's energy trajectory: it allows planned work to be announced, adjustment (modulation) decisions to be prepared and the consultation required by Article L. 174-1, II, to be documented. In a property with several tenants, the contract specifies how the charges or the cost of the works are allocated among the different tenants, according to the floor area occupied, the allocation being capable of contractual weighting under the conditions of Article R. 145-35.
Exposure to risk: deferred inspection, public display and administrative penalty
Article R. 174-31 CCH sets the inspection timetable: no later than 31 December 2031, 2041 and 2051, the manager of the digital platform verifies, for all those subject to the obligation provided for in Article L. 174-1, that the objectives set have been achieved. It is therefore not an ongoing compliance check, but a check that the objectives have been met at fixed dates, the consumption taken into account being consumption adjusted for climatic variations. Where applicable, the technical file provided for in Article R. 174-26, which makes it possible to justify the modulation of the objective, is kept available to the officers responsible for inspections.
This structure produces a time-lag effect that is dangerous for asset holders. A reporting failure in one year does not show up immediately, but it degrades the calculation base and the ability to justify a trajectory when the verification takes place. The modulations provided for in Part I of Article L. 174-1, based on technical, architectural or heritage constraints, on a change in the activity or its volume, or on costs manifestly disproportionate to the expected benefits of the actions, cannot be built retroactively: they require a technical file that has been compiled and kept.
Article R. 174-31 also allows, for the verification of compliance with the objectives, those subject to the obligation to pool results across all or part of their portfolio subject to the obligation, under conditions laid down by order. For a multi-asset investor, this is a genuine lever: concentrating capex effort on the assets where the gain per kWh is highest, rather than treating every building uniformly. It remains necessary that the holding structure and the leases do not stand in the way of this overall view.
There is also a transparency obligation whose reputational effect is underestimated. Under Article R. 174-32, final energy consumption and the objectives are published on the basis of the annual digital certificate generated by the platform, supplemented by an assessment of greenhouse gas emissions expressed in kg of CO2 equivalent per square metre, by display in a visible and easily accessible place or by any other appropriate means allowing easy access to the information. The building's performance thus becomes a datum visible to occupiers, visitors and, in practice, the market.
On penalties, caution is required. 7° of Part III of Article L. 174-1 refers to a decree of the Conseil d'État the task of determining the rules for implementing an administrative penalty procedure in the event of failure to comply with the obligation. The amounts and rules frequently cited in the specialist press must be checked against the applicable text before being relied on against a counterparty or built into a penalty clause. What is certain, on the other hand, is that liability is shared: a clause that purports to make one party bear all the consequences of an administrative failure does not change that party's status as a person subject to the obligation vis-à-vis the administration, and merely creates a contractual remedy between the parties.
Asset value and usability: the annual certificate as a due diligence document
Article L. 174-1, II, provides that the assessment of compliance with the obligation is annexed, for information, to the preliminary sale agreement (promesse or compromis) in the case of a sale and, failing that, to the notarised deed (acte authentique), and to the lease in the case of a letting. Article R. 174-31 specifies that this assessment is carried out on the basis of the latest annual digital certificate.
Two opposing readings are in circulation; both are inaccurate. This annex is not a condition of validity of the deed: the text expressly describes it as information. But it is no more without effect. It fixes, in the transaction file, the declared state of the asset's energy trajectory. Its absence, its inconsistency with actual consumption, or the very absence of any reporting history are all elements that can be used in negotiating the price, in discussing an asset and liability warranty, and even later in the area of pre-contractual information. A buyer who discovers after signing that the reference year was never declared, or that it was set on an atypical year, inherits a more demanding trajectory and unprovisioned capex. The transfer of leases and the asset and liability warranties specific to this type of transaction are dealt with separately in our article on the sale of an occupied building.
The effect on the usability of the asset is just as concrete. A building whose trajectory is documented, whose leases organise data collection and the allocation of works, and whose three-year statement announces a credible programme, can be relet and refinanced on better terms than an asset whose energy file has to be reconstituted. Conversely, a lease that is silent on the declaration turns every renewal and every new tenant into an open negotiation on the burden of the works, at precisely the moment when the landlord has the least room for manoeuvre.
What needs to be decided now
The scheme does not leave a choice as to the organisation, it leaves a choice as to the allocation. Article L. 174-1, II, and Article R. 174-28 refer to the lease, and the lease, in the majority of portfolios built up before 2021, says nothing. The main risk is therefore not regulatory in the short term, since verification that the objectives have been met will take place no later than 31 December 2031; it is contractual and asset-related, and it materialises today at every renewal, every sale and every refinancing.
Our position is clear. The OPERAT allocation clause should not be treated as an ancillary administrative clause, but as an economic clause, negotiated with the same attention as the allocation of charges and the works programme, and aligned with the exhaustive inventory under Article L. 145-40-2 and the limits of Article R. 145-35. Three actions are needed before the next reporting deadline: audit the portfolio to identify, site by site and not lot by lot, the properties crossing the 1,000 m² threshold; check that the declared reference year and its supporting documents are defensible, because the whole trajectory depends on it; and insert, in every lease concluded or renewed, a clause distinguishing liability, the material performance of the transmission, the reciprocal delivery of data and the burden of the works. Have this clause reviewed against Article R. 145-35 before signing: an overly broad transfer clause does not protect the landlord, it gives a false sense of security that will come to light at the first dispute.
Frequently asked questions
Who must declare on OPERAT, the owner or the tenant? Both are subject to the obligation. Article L. 174-1, II, of the CCH subjects owners and, where applicable, tenants to the obligation for the actions that fall within their respective responsibilities by virtue of the contractual provisions governing their relationship. Article R. 174-28 specifies that the annual declaration is made by the owner or by the tenant according to their respective responsibility under the contractual provisions. It is therefore the lease that makes the allocation, not the regulatory text.
Does a lease that is silent on the OPERAT declaration release the tenant? No. The silence of the lease does not remove liability, which arises from statute as soon as the building or group of buildings reaches the threshold of 1,000 m² of floor area. It creates uncertainty as to the allocation, which the administration is not meant to resolve and which will be settled between the parties. In practice, each remains required to transmit the consumption concerning it and to communicate to the other that of the equipment it operates.
Is the 1,000 m² threshold assessed per let unit? No. Article R. 174-22 CCH uses three methods of assessment: the building housing exclusively tertiary activities, the cumulative tertiary parts of a mixed-use building, and the group of buildings located on the same land unit or the same site. A tenant with a modest floor area may therefore be caught through cumulation. Furthermore, where activities cease and the floor area falls below 1,000 m², those who continue to carry on a tertiary activity remain subject to the obligation.
Can the landlord re-invoice energy renovation works to the tenant? Not without limit. For leases concluded or renewed since 5 November 2014, Article R. 145-35 of the French Commercial Code prohibits charging to the tenant the costs of the major repairs referred to in Article 606 of the French Civil Code, as well as works intended to remedy obsolescence or to bring the property into compliance with regulations, where they fall within those major repairs. The classification is assessed work by work. Recoverable costs must also appear in the precise and exhaustive inventory required by Article L. 145-40-2.
What is the deadline for the annual declaration? It no longer appears in the CCH. Since Decree No. 2021-1271 of 29 September 2021, Article R. 174-27 provides that the data is transmitted each year by deadlines set by a joint order of the ministers responsible for construction and energy. One must therefore refer to the so-called "method" order in the version applicable to the year concerned, and avoid fixing a date in the lease.
Does the absence of an annual certificate prevent a sale? No. Article L. 174-1, II, provides that the assessment of compliance with the obligation is annexed for information to the preliminary sale agreement (promesse or compromis) and, failing that, to the notarised deed (acte authentique), Article R. 174-31 specifying that it is carried out on the basis of the latest annual digital certificate. It is not a condition of validity. However, its absence deprives the buyer of information on the asset's trajectory and constitutes a negotiating point on price and warranties.
Environmental annex and tertiary decree: are they the same obligation? No, and the thresholds differ. The environmental annex under Article L. 125-9 of the French Environmental Code is mandatory for leases concluded or renewed covering premises of more than 2,000 square metres used as offices or shops, whereas the tertiary scheme applies from 1,000 m² of floor area. The two usefully overlap: the annex organises the mutual communication of information on consumption and the landlord's access to the premises for works improving energy performance.
The simulator below sets out, according to the energy rating, the letting bans, the rent freeze and the obligations on a sale.
Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.
Décrire ma situationA commercial lease to defend or renegotiate?
Notice to quit, renewal, eviction indemnity: everything turns on dates and on the form of the documents.