Right to compel purchase (Art. L. 230-1 French Urban Planning Code): forcing the local authority to buy frozen land

Land entered as a reserved site (emplacement réservé) in the local urban plan (plan local d'urbanisme, PLU) cannot be sold, or can be sold only at such a discount that the transaction no longer makes sense. Charges, property tax and sometimes the real estate wealth tax (IFI) continue to accrue; buildability, meanwhile, is suspended pending a public decision whose timing does not belong to the owner. The right to compel purchase (droit de délaissement) reverses this asymmetry: it allows the owner to require the authority that benefits from the reserve, not to abandon its project, but to choose between buying and releasing the land. This guide sets out the mechanism of Article L. 230-1 of the French Urban Planning Code and the surrounding provisions: the cases in which it opens, the form and addressee of the formal notice to acquire, the one-year period, referral to the expropriation judge, the effects of the transfer, and the choice between an immediate request and holding the asset.

What the right to compel purchase actually covers

The right to compel purchase is expropriation in reverse. In the classic scheme, the public authority takes the initiative of compulsory acquisition. Here, it is the owner who starts the procedure and obliges the authority to state its position, then, if there is disagreement on the price, to appear before the expropriation judge.

Article L. 230-1 of the French Urban Planning Code is the pivotal provision of Title III of Book II. It states that the rights to compel purchase provided for by Articles L. 152-2, L. 311-2 or L. 424-1 are exercised under the conditions laid down by that title. In other words, three distinct planning restrictions open the same procedural route, with a common timetable and a common judge.

Two points on scope must be made at the outset. First, the numbering resulting from Ordinance No. 2015-1174 of 23 September 2015 replaced the former Articles L. 111-11, L. 123-2 and L. 123-17: any analysis based on those references is obsolete. Second, the mechanism known as the right to compel purchase in a deferred development zone (zone d'aménagement différé) falls under Article L. 212-3 and follows its own regime, which we come back to below.

Reserved sites in the PLU (L. 152-2)

This is the most frequent case. Article L. 151-41 allows the PLU regulations to delimit land bearing reserved sites for public roads and works, for facilities of general interest to be created or modified, for green spaces or spaces needed for ecological continuities, for housing programmes in urban and to-be-urbanised zones, and, since Law No. 2021-1104 of 22 August 2021, for the relocation of facilities exposed to coastal erosion. The same article authorises, in urban and to-be-urbanised zones, restrictions prohibiting, for a period of no more than five years pending approval of a comprehensive development project, buildings with a floor area above a threshold set by the regulations.

Article L. 152-2 gives the owner of land, built or undeveloped, reserved in this way the right to require its acquisition. Two points deserve attention procedurally. The right is exercised as soon as the plan can be relied on against third parties, and even if a decision to defer a ruling (sursis à statuer) that was raised against the owner is currently valid. It is therefore not necessary to have applied for, and been refused, planning permission: the mere enforceability of the plan is enough. It is a classic mistake to file an application doomed to refusal in order to "clear" a precondition that does not exist in this situation.

Second, the text also covers the restrictions referred to in Article L. 151-41: where such a restriction is instituted, the owners concerned may serve formal notice on the municipality to acquire their land.

Joint development zones (L. 311-2)

From publication of the instrument creating a joint development zone (zone d'aménagement concerté, ZAC), owners of land within that zone may serve formal notice on the public authority or public body that took the initiative of creating the zone to acquire their land, under the conditions and time limits laid down in Article L. 230-1. The triggering event is therefore publication of the creation instrument, not actual completion of the operation or appointment of the developer.

For an investor holding an asset within a ZAC perimeter, the question is less legal than economic: the right to compel purchase fixes the price under the rules of expropriation, whereas a negotiation with the developer may include a stake in the operation or consideration in the form of building rights.

After a deferral of ruling (L. 424-1)

The last paragraph of Article L. 424-1 provides that, where a decision to defer a ruling has been made, the owners of land against whom a refusal of authorisation to build or to use the land has been raised may serve formal notice on the authority or public service that took the initiative of the project to acquire their land.

Here, unlike the reserved site case, the refusal raised against the owner is the condition for opening the right. The same article strictly limits the tool: the deferral of ruling must be reasoned and may not exceed two years; on expiry of the validity period of the deferral ordered, the competent authority may not raise a new deferral on the same ground against the same application; if different grounds allow a new deferral on another statutory basis, the total duration of the deferrals ordered may in no case exceed three years. Finally, the decision to take a project into consideration provided for in points 2° and 3° of Article L. 424-1 and in Article L. 102-13 ceases to have effect if, within ten years of its entry into force, the execution of the public works or the carrying out of the development operation has not begun.

The strategy can then be read on two fronts: challenge the deferral before the administrative court, or accept it and turn the constraint into an obligation to acquire. The two routes are not mutually exclusive, but they do not have the same liquidity horizon. The usual weak points of a deferral and the available responses are analysed in our article on neutralising a deferral of ruling on a building permit.

The formal notice to acquire: form, addressee, content

Article L. 230-1 settles three practical questions that determine the validity of the step.

First, the addressee. The formal notice to acquire land, built or not, is addressed by the owner to the town hall of the municipality where the property is located. The rule applies whatever the beneficiary of the reserve. Where the reserved site benefits the département, an inter-municipal body or a public service, the request is still addressed to the town hall of the municipality where the property is located. Addressing the formal notice to acquire only to the beneficiary named in the plan exposes the owner to a challenge over the starting point of the one-year period.

Second, the content. The formal notice mentions farmers, tenants, those who hold rights of long lease (emphytéose), occupation or use, and those who may claim easements. This mention is not an archiving formality: it determines the scope of the compensation that the expropriation judge will, where applicable, award to those right-holders. The calculation and challenge of the compensation due to a commercial tenant are dealt with separately in our article on expropriation compensation for a commercial tenant.

Third, collective publicity. Other interested parties are called on to assert their rights by collective publicity, at the initiative of the authority or public service served with the formal notice. They must make themselves known within two months, failing which they lose all right to compensation. For a landlord-owner, this clearing has a direct benefit: it cleans up the position of competing rights before the transfer.

As to the form itself, the Urban Planning Code imposes no model. Prudence calls for a method of dispatch that establishes the date of receipt at the town hall beyond dispute, since it is that date, not the date of dispatch, that starts the time limits running.

The timetable: one year, two years, three months

Article L. 230-3, in the wording resulting from Law No. 2025-1129 of 26 November 2025, sets out three deadlines that must be kept distinct.

  • One year to state a position. The authority or public service served with the formal notice must state its position within one year of receipt at the town hall of the owner's request.
  • Two years to pay where there is agreement. Where there is an amicable agreement, the acquisition price must be paid no later than two years from receipt at the town hall of that request. The starting point is the same: receipt at the town hall, not the date of the agreement.
  • Three months after expiry of the one-year period, in the sole case of land reserved under Article L. 152-2, to refer the matter to the expropriation judge, on pain of the sanction described below.

Failing amicable agreement on the price on expiry of the one-year period referred to in the first paragraph, the expropriation judge, seised either by the owner or by the authority or public service served with the formal notice, orders the transfer of ownership and fixes the price of the property.

The wording deserves a pause. Until entry into force of the Law of 26 November 2025, the text referred to the absence of amicable agreement without further precision. It now refers to the absence of amicable agreement on the price. The amendment narrows the wording to the subject of the disagreement. Until the exact scope of this wording has been clarified by case law, it is prudent, in the file, to document precisely the nature of the disagreement and to keep a written record of the respective positions on the value of the property before referring the matter to the judge.

The sanction for silence: the reserve ceases to be enforceable

Article L. 230-4, also amended by the Law of 26 November 2025, provides that in the case of land reserved under Article L. 152-2, the limitations on the right to build and the reserve can no longer be relied on if the expropriation judge has not been seised three months after expiry of the one-year period referred to in Article L. 230-3.

The effect is radical and is the real lever of the mechanism. After that date, the land regains its ordinary buildability and the owner recovers control of the asset. The Law of 26 November 2025 also deleted the sentence that expressly reserved referral to the expropriation judge beyond those three months. The text in force therefore no longer contains that reservation, which means a strategy should not be built on a late referral.

Two warnings. First, this sanction applies, literally, only to land reserved under Article L. 152-2. It cannot be transposed as it stands to a request in a ZAC or to a request following a deferral of ruling. Second, the mechanism demands discipline on timing: the date of receipt at the town hall must be established, the one-year term calculated, and the decision whether or not to refer the matter taken before expiry of the following three months.

Setting the price by the expropriation judge

Once seised, the expropriation judge does not merely value: the judge orders the transfer of ownership and fixes the price of the property. Three valuation rules structure the economic outcome of the procedure.

First rule: the price, including the reinvestment allowance, is fixed and paid as in expropriation, without regard to the provisions that justified the right to compel purchase. The restriction that froze the land is therefore neutralised in the valuation. This is the keystone of the mechanism: the authority cannot rely on the loss of value that it caused itself.

Second rule: the reference date provided for in Article L. 322-2 of the French Code of Expropriation for Public Purposes is the date on which the most recent of the instruments making public the local urban plan, or approving, revising or amending it and delimiting the zone in which the land is located, became enforceable against third parties. In the absence of a published land-use plan (plan d'occupation des sols) or a PLU, Article L. 230-3 sets default rules that differ according to the case in which the right opens, in particular one year before creation of the joint development zone for the cases referred to in Article L. 311-2. Analysing the reference date is, in practice, the first task to carry out: it determines the enforceable zoning adopted and therefore most of the value.

Third rule: the judge also fixes, where appropriate, the compensation to which the persons referred to in Article L. 230-2 may be entitled, which refers to the right-holders identified in the formal notice and to those who came forward within the two-month period.

Two options often overlooked

Article L. 230-3 gives the owner the possibility to require the taking of the whole of the land in the cases provided for in Articles L. 242-1 to L. 242-5 of the Code of Expropriation for Public Purposes. Where the reserve affects only part of the plot and renders the remainder unusable, this request for a total taking changes the economics of the file. It should be examined at the outset, against the conditions laid down by the Code of Expropriation.

The text also provides that the acquisition of land located in a reserved site may, with the agreement of the public body for whose benefit the reserve is entered in the plan, be carried out by another public body or by the holder of a development concession, the purpose of the reserved site remaining unchanged. A beneficiary with no immediate budgetary capacity is therefore not necessarily an obstacle: substitution of the acquirer is an amicable way out to explore before litigation.

Effects of the transfer on the rights of third parties and creditors

Article L. 230-5 produces a clearing effect comparable to that of expropriation: the instrument or decision transferring ownership extinguishes by itself and as of its date all real or personal rights existing over the transferred properties even in the absence of a prior declaration of public utility. The rights of registered creditors are transferred to the price under the conditions provided for in Article L. 222-3 of the Code of Expropriation for Public Purposes.

For a mortgage lender whose debtor holds frozen land, the reading is twofold. The right to compel purchase turns security over an illiquid asset into a claim carried over onto an available price, which improves recovery. But it also fixes the value of the security at the value set by the expropriation judge, with no later upside. The trade-off is made case by case, according to the rank of the registration and the prospects for a change in zoning.

Finally, Article L. 230-2 deals with a succession situation that is often decisive. The heirs of a deceased owner may, on showing that the property concerned represents at least half of the estate and provided they submit the request for acquisition within six months of the opening of the succession if the deceased had not made it, require that recovery of the transfer duties on the succession be deferred, up to the amount of the price, until that price has been paid. The six-month period is short and the proportion condition must be documented from the filing of the succession return.

Claim or hold: the terms of the trade-off

The right to compel purchase is not always the best option. Four parameters determine the decision.

The first is the expected value. The price is fixed as in expropriation, at the reference date resulting from the most recent planning instrument delimiting the zone. If the zoning enforceable at that date is of little value, the right to compel purchase crystallises a low value, even though the neutralisation of the provisions that justified it works in the owner's favour.

The second is the likelihood of a change to the plan. Holding the asset makes sense where revision of the PLU is under way and removal or relocation of the reserve is conceivable. Holding has an annual cost, which must be set against the buildability gain hoped for, and an uncertain duration. On the interplay between plan revision, land-use sobriety objectives and the right to compel purchase, see our analysis of the land risk linked to the ZAN (net zero land take) target and deferral of ruling.

The third is the capacity of the authority to react. Properties acquired through this right fall, by cross-reference from Article L. 230-6, under the regime of Article L. 221-2: the public body must manage them reasonably and, before their final use, these properties may not be transferred in full ownership other than between public bodies and for the carrying out of the operations for which the reserve was created. They may be the subject only of temporary concessions that confer on the holder no right of renewal and no right to remain in occupation. Specific notice periods apply to agricultural land: at least one year where compensation to the farmer for destruction of the crop before harvest is provided for in the contract, three months before the harvest is gathered, or three months before the end of the crop year. This straitjacket explains part of the budgetary and operational reluctance of authorities served with a formal notice.

The fourth parameter is the scenario of inaction. For land reserved under Article L. 152-2, the formal notice to acquire is not a one-way bet: either the authority acquires, or it lets the time limits run and the reserve ceases to be enforceable under Article L. 230-4. In both cases, the owner gets out of the freeze. This is precisely what makes the tool effective for an investor whose holding horizon is constrained by a refinancing or a disposal timetable.

Not to be confused with the deferred development zone regime

Article L. 212-3 follows a different logic, which it would be costly to transpose. The owner offers the property to the holder of the pre-emption right, stating the price that the owner asks for it. The holder must state its position within two months of the offer. Failing amicable agreement, the price is fixed by the court with jurisdiction in expropriation matters under the rules referred to in Article L. 213-4. If the holder refuses or fails to reply within two months, the property ceases to be subject to the pre-emption right. Neither the one-year period, nor Article L. 230-3, nor the sanction of Article L. 230-4 applies to this mechanism.

Areas of uncertainty to secure before acting

Several questions are not settled by the texts and must be treated as file risks, not as established points.

First, the temporal scope of Law No. 2025-1129 of 26 November 2025: the versions of Articles L. 230-3 and L. 230-4 in force carry no apparent transitional provision, but the fate of formal notices served before 28 November 2025 deserves checking file by file.

Second, whether the formal notice is irrevocable. None of the texts of Title III settles whether the owner may withdraw the request before the transfer of ownership. The question is for the courts to assess, which is a reason not to start the procedure merely as a means of applying pressure.

Finally, the sanction for non-payment of the price within two years where there is amicable agreement: Article L. 230-3 sets the deadline but draws no express consequence from it, unlike Article L. 212-3 for the ZAD. The drafting of the amicable agreement must therefore itself provide for the consequences of late payment.

To these are added standing to act in complex situations, such as joint ownership (indivision), split ownership (démembrement) or acquisition after the reserve was instituted, which the texts we have read do not expressly address, and the interplay between the authority's decision on the formal notice, which may fall to the administrative judge, and the role of the expropriation judge.

Conclusion: a liquidity tool, to be triggered on a controlled timetable

The right to compel purchase is not a defensive procedure. It is a liquidity instrument that obliges the authority to choose, at its own expense, between its project and maintaining an unfunded restriction. On land reserved under Article L. 152-2, the outcome is favourable on both branches of the alternative: acquisition at the price fixed as in expropriation, reinvestment allowance included, or loss of enforceability of the reserve and of the limitations on the right to build. Our position is that land frozen for several financial years with no serious prospect of the public project being carried out has no reason to remain passively held.

Before sending the formal notice, have two things established: the applicable reference date within the meaning of Article L. 322-2 of the Code of Expropriation, which will determine most of the value, and the exhaustive list of right-holders to be mentioned under Article L. 230-1. Then keep to the timetable to the day from receipt at the town hall. One year, three months: these two limits decide the outcome of the file.

Frequently asked questions

Must a building permit refusal have been obtained before exercising the right to compel purchase? No, not in the case of a reserved site in the PLU. Article L. 152-2 allows the owner to require acquisition as soon as the plan can be relied on against third parties, and even if a decision to defer a ruling that was raised against the owner is currently valid. A prior refusal is a condition only in the case of the last paragraph of Article L. 424-1, which covers owners against whom a refusal of authorisation was raised following a decision to defer a ruling. Filing an application doomed to fail in order to "open" the right to compel purchase on a reserved site wastes several months with no legal benefit.

To whom should the formal notice to acquire be addressed when the reserve benefits the département or the inter-municipal body? To the town hall of the municipality where the property is located. Article L. 230-1 of the French Urban Planning Code makes no distinction according to the identity of the beneficiary of the reserve: the formal notice is addressed by the owner to the town hall of the municipality where the property is located, which is responsible for passing it on. The starting point of the one-year period is receipt at the town hall, which requires a method of dispatch that establishes that date beyond dispute.

What happens if the authority does not reply within one year? For land reserved under Article L. 152-2, Article L. 230-4 provides that the limitations on the right to build and the reserve can no longer be relied on if the expropriation judge has not been seised three months after expiry of the one-year period. The owner must therefore choose: refer the matter to the judge within that three-month period to obtain the transfer and the price, or let time run to recover buildability. The Law of 26 November 2025 deleted the sentence that expressly reserved a referral beyond those three months, which means one should not count on a late referral.

How is the price fixed and is the restriction taken into account? The expropriation judge orders the transfer of ownership and fixes the price of the property. That price, reinvestment allowance included, is fixed and paid as in expropriation, without regard to the provisions that justified the right to compel purchase. The reference date under Article L. 322-2 of the Code of Expropriation is the date on which the most recent of the instruments making public the PLU, or approving, revising or amending it and delimiting the zone in which the land is located, became enforceable against third parties.

Can the owner require acquisition of the whole plot when the reserve affects only part of it? Article L. 230-3 provides that the owner may require the taking of the whole of the land in the cases provided for in Articles L. 242-1 to L. 242-5 of the Code of Expropriation for Public Purposes. The request therefore requires checking that the conditions laid down by those articles are met, having regard in particular to the state of the remainder after the reserved portion is taken. This question must be settled before the formal notice, because it changes the scope of the valuation.

Does the right to compel purchase in a deferred development zone follow the same rules? No. Article L. 212-3 requires the owner to state the price asked, and the holder of the pre-emption right must state its position within two months. Failing amicable agreement, the price is fixed by the expropriation court under the rules of Article L. 213-4. If the holder refuses or remains silent within two months, the property ceases to be subject to the pre-emption right, with no transfer of ownership. The one-year period of Article L. 230-3 does not apply.

Do mortgage creditors keep their rights after the transfer? The instrument or decision transferring ownership extinguishes by itself and as of its date all real or personal rights existing over the transferred properties, even in the absence of a prior declaration of public utility. The rights of registered creditors are transferred to the price under the conditions provided for in Article L. 222-3 of the Code of Expropriation. For a lender, the right to compel purchase converts security over an illiquid asset into a claim on an available price, with the corresponding consequences in terms of rank and distribution.

The simulator below lists the pre-emption and first refusal rights to clear before the sale, with their deadlines.

Votre situation ressemble-t-elle à celle-ci ?

Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.

Décrire ma situation
Sans engagement – réponse du cabinet sous quarante-huit heures ouvrées.
• Vous êtes concerné ?

A question about your own situation?

The firm assists business owners, investors and private individuals, from upstream advice through to litigation.

generique
right-to-compel-purchase-art-l-230-1-urban-planning-code-frozen-land
Questionnaire
×
Merci, votre demande est bien parvenue au cabinet. Une réponse vous sera adressée sous quarante-huit heures ouvrées.
L’envoi n’a pas abouti. Vous pouvez écrire directement à contact@avocats-gloria.com.

Vos réponses aux questions précédentes sont jointes à votre message. Réponse sous quarante-huit heures ouvrées.

Ces questions ne constituent pas une consultation juridique et ne remplacent pas l’examen de vos pièces. Les informations transmises servent uniquement à répondre à votre demande et ne sont pas cédées à des tiers.