Two-year functional warranty (Art. 1792-3 Civil Code): the two years that cover a building's equipment

An investor takes acceptance (réception) of a restructured office building in January. Eighteen months later, the air-handling unit no longer holds the contractual temperatures, two lifts break down repeatedly and the motorised blinds on the south façade jam. The contractor stalls, offers adjustments, promises an intervention. Time passes, and the question is no longer technical but procedural: how much time does the client (maître de l'ouvrage) still have, on what basis, and which act preserves its position. This guide deals with the decision timetable specific to the two-year functional warranty (garantie biennale de bon fonctionnement) of Article 1792-3 of the French Civil Code: what falls under it rather than under the ten-year liability (décennale) or the completion warranty (garantie de parfait achèvement), who owes it, which act interrupts the time limit, and when to start summary proceedings for an expert appointment (référé-expertise) on the basis of Article 145 of the French Code of Civil Procedure.

What Article 1792-3 says exactly, and what it does not say

The text is short. In its wording resulting from Order No. 2005-658 of 8 June 2005:

The other items of equipment of the work are subject to a functional warranty of a minimum duration of two years from its acceptance.

Three expressions structure the whole analysis.

The other first: Article 1792-3 is defined by subtraction. It captures the items of equipment that fall outside the presumption of Articles 1792 and 1792-2. The two-year warranty is therefore a residual warranty, and not a free-standing regime that one would choose to invoke. Characterisation is done by elimination, in a prescribed order.

Of the work next. The 2005 Order replaced the term "building" found in the earlier wording with the term "work" (ouvrage). The scope is therefore no longer limited to buildings in the strict sense.

Minimum duration of two years finally. The period is a floor, not a ceiling. A works contract, a special administrative specification (CCAP) or a development contract may extend the functional warranty on certain technical packages. They cannot shorten it: Article 1792-5 deems unwritten any clause whose purpose is "to exclude the warranties provided for in Articles 1792-3 and 1792-6 or to limit their scope". This provision calls for a careful re-reading of off-plan sale contracts (VEFA) and investors' works contracts that refer to a twelve-month "contractual contractor warranty" on equipment: the stipulation is neutralised to the extent that it reduces the statutory minimum.

The text does not, however, contain any list of the equipment concerned. No provision of the Civil Code enumerates the packages falling under the two-year equipment warranty. Characterisation is made case by case, under the control of the trial courts, according to the material criterion laid down by Article 1792-2. In practice, disputes concern technical packages and mobile or removable equipment, but no characterisation can be taken for granted before the installation conditions have been examined.

Ten-year or two-year: the tipping criterion, word for word

The choice between the two regimes is not made by intuition. It is made by applying two texts in succession.

First question: does the damage make the work unfit for its purpose?

Article 1792 imposes liability by operation of law on the builder for damage that compromises the soundness of the work or which, "affecting it in one of its constituent elements or one of its items of equipment, renders it unfit for its purpose". The wording of the text is decisive for the investor: a defect affecting an item of equipment may fall under the ten-year liability, not because the equipment would be inseparable, but because its consequences reach the work itself in its purpose. To write that any separable item of equipment necessarily falls under the two-year warranty is an error of analysis, and an error of timing.

The practical scope is considerable. A commercial asset whose heating and cooling production no longer allows the floors to be occupied, a residential building whose ventilation system generates health problems: the discussion on unfitness for purpose is not theoretical, it determines whether the client has two years or ten.

Second question: is the equipment inseparable from the structural works?

Article 1792-2 extends the presumption of Article 1792 to damage affecting the soundness of items of equipment, "but only where these form an inseparable whole with the works of services, foundation, framework, enclosure or roofing". The text itself gives the test:

An item of equipment is considered to form an inseparable whole with one of the works of services, foundation, framework, enclosure or roofing where its removal, dismantling or replacement cannot be carried out without damage to or removal of material from that work.

The criterion is material and is checked on site, not on plan. The same equipment may be separable in one configuration and inseparable in another, depending on the method of fixing chosen by the contractor. That is precisely what the court-ordered expert examination must establish, and it is a further reason not to defer the application for it.

Third question: is it equipment with an exclusively professional function?

Article 1792-7 excludes from the notion of items of equipment, within the meaning of Articles 1792, 1792-2, 1792-3 and 1792-4, those "including their accessories, whose exclusive function is to allow a professional activity to be carried on in the work". For an investor in business premises, logistics warehouses or industrial sites, this exclusion requires a distinction to be drawn, from the structuring phase, between what belongs to the building and its technical equipment and what belongs to production machinery or process equipment. The latter fall outside the regime of Articles 1792 et seq.; their protection is a contractual matter, in supply and installation contracts and in contractor warranties negotiated package by package.

If all three questions are answered in the negative, the defect falls under the two-year functional warranty. And the clock is running.

Acceptance, the single starting point of the three warranties

Article 1792-6 defines acceptance as "the act by which the client declares that it accepts the work with or without reservations". It takes place at the request of the most diligent party, either by agreement or, failing that, by court order, and it is "in any event, pronounced on an adversarial basis".

This point deserves to be hammered home because practice constantly blurs it. The two-year warranty period runs neither from delivery, nor from completion, nor from the commissioning of the equipment, nor from handing the keys to the tenant. It runs from acceptance. The three statutory warranties start from that same date:

  • completion warranty: one year from acceptance (Art. 1792-6);
  • functional warranty: two years minimum from acceptance (Art. 1792-3);
  • ten-year liability: ten years from acceptance (Art. 1792-4-1).

Article 1792-4-1 closes the system: any person whose liability may be engaged under Articles 1792 to 1792-4 is discharged "after ten years from acceptance of the works or, by application of Article 1792-3, on expiry of the period referred to in that Article".

The first step for a client as for a purchaser is therefore documentary: identify the acceptance report, its date, its scope package by package, and the reservations it mentions. On an operation accepted in phases, there are as many starting points as there are acceptances.

What the completion warranty really covers

In the first year, the completion warranty does not absorb everything. Article 1792-6 limits it to "all defects notified by the client, whether by means of reservations noted in the acceptance report, or by written notification for those revealed after acceptance". A defect that is not notified is not covered. The text adds that the warranty "does not extend to the works necessary to remedy the effects of normal wear and tear or of use". The regime of this warranty, from formal notice to performance at the cost and risk of the defaulting contractor, is detailed in our article on the completion warranty.

Its sanction is specific: failing agreement on the repair periods or in the event of non-performance, the works may, "after a formal notice that has remained without effect, be carried out at the cost and risk of the defaulting contractor". This is a lever for enforcement, useful for twelve months, and it presupposes rigorous written traceability of the notifications.

Operational consequence: during the first year, the client must notify in writing every malfunction of equipment, even a minor one, even one being adjusted. This discipline serves the completion warranty, and it forms the evidential foundation of the two-year action if the defect persists beyond that.

Who owes the two-year warranty

Article 1792-1 deems a builder any architect, contractor, technician or other person bound to the client by a contract for the hire of work, any person who sells after completion a work that it built or had built, and the agent performing a mission comparable to that of a party hiring out its work. These persons owe the functional warranty.

For the purchasing investor, two texts are decisive. Article 1646-1 subjects the seller of a building to be constructed, from acceptance of the works, to the obligations of Articles 1792 to 1792-3, and specifies that "these warranties benefit successive owners of the building". Article 1792-1, 2°, covers the seller after completion of a work that it built or had built. The purchaser of a recent asset therefore inherits the position of a creditor of the warranty, provided it knows the date of acceptance and does not discover the technical file after the two-year period has expired.

The manufacturer may be pursued jointly and severally. Article 1792-4 makes the manufacturer of an item of equipment designed and produced to meet, in working condition, precise requirements determined in advance, jointly and severally liable for the obligations imposed by Articles 1792, 1792-2 and 1792-3 on the contractor who installed it "without modification and in accordance with the rules laid down by the manufacturer". Treated as manufacturers are the importer of an item made abroad and any person who presented it as its own work by having its name, trademark or any other distinctive sign appear on it. The condition of conforming installation is the weak point of this action: it is shown by expert examination, not by the invoice.

The subcontractor falls under a distinct basis. The action against it does not arise under Article 1792-3 but under Article 1792-4-2, which subjects liability actions against a subcontractor to a period of ten years from acceptance for the damage referred to in Articles 1792 and 1792-2, and "to two years from that same acceptance" for damage affecting the items of equipment mentioned in Article 1792-3. The period is the same, the basis is not. The writ must cite the correct text for each defendant.

The insurance blind spot

The statutory insurance obligation does not cover the two-year warranty.

Article L. 241-1 of the French Insurance Code requires cover from "any natural or legal person whose ten-year liability may be engaged on the basis of the presumption established by Articles 1792 et seq. of the Civil Code". The text refers to ten-year liability.

Article L. 242-1 requires the client to take out, before the site opens, insurance guaranteeing payment for repair works for "damage of the kind for which builders within the meaning of Article 1792-1, manufacturers and importers or the technical inspector are liable on the basis of Article 1792 of the Civil Code". Property damage insurance (assurance dommages-ouvrage) takes effect after expiry of the completion warranty period. It is calibrated on Article 1792, and not on Article 1792-3. On the notification of a claim and the insurer's obligations, see our analysis of how to call on property damage insurance.

The result is an asymmetry that the investor must factor into its risk analysis. A ten-year defect is, by construction, backed by compulsory cover. A two-year defect is not: repair depends on the contractor's solvency or on the existence of optional cover it has taken out, whose content varies and must be checked in the specific conditions of the policy. The failure of a technical-package contractor can therefore strip a two-year claim of all economic value. This calls for not allowing a long amicable phase to set in with a contractor whose financial situation is deteriorating.

The decision timetable, from acceptance to the twenty-fourth month

Up to month 12

Notify in writing every defect affecting an item of equipment, citing Article 1792-6. Agree on the periods for carrying out the remedial works. In the event of non-performance, serve formal notice, then consider performance at the cost and risk of the defaulting contractor. Document: reports, records of findings, technical surveys, notification letters. At this stage, the evidential file is built at reduced cost.

From month 12 to month 18

This is the decision window. The client must choose between continuing the amicable approach and starting a measure of inquiry. Two criteria govern the choice: whether the defect persists after interventions, and the realistic prospect of a negotiated solution in the time remaining. Beyond eighteen months, the margins close.

From month 18 to month 24

This is the procedural securing phase. A registered letter, a site meeting or an adjustment protocol do not produce the legal effect sought. Article 2241 of the French Civil Code is explicit on what does produce that effect:

A claim brought before a court, even in summary proceedings, interrupts the limitation period as well as the period of forfeiture. The same applies where it is brought before a court lacking jurisdiction or where the document seising the court is annulled by reason of a procedural defect.

Three lessons. Summary proceedings produce the interrupting effect. Article 2241 expressly refers to the period of forfeiture (forclusion), and not only to limitation. And an error of jurisdiction or a procedural defect affecting the document seising the court does not lose the benefit of the interruption.

Why the characterisation of the two-year period is decisive

The texts reviewed do not characterise the period in Article 1792-3. This uncertainty has an immediate practical consequence for procedural strategy.

Article 2239 provides that limitation is suspended when the judge grants an application for a measure of inquiry made before any proceedings, and that it "starts running again, for a period which may not be less than six months, from the day on which the measure was carried out". But this text refers only to limitation. Article 2220, however, provides that periods of forfeiture are not, "unless otherwise provided by law", governed by the title devoted to extinctive limitation. If the two-year period is analysed as a period of forfeiture, the benefit of suspension under Article 2239 is not secured on the basis of the texts alone.

The operational consequence is simple and must be stated plainly: do not build a timetable on the assumption that the order for an expert appointment in summary proceedings will freeze the period for the whole duration of the expert's work. The safe reflex is to reason on the interrupting effect of Article 2241, which expressly refers to forfeiture, and to commence the main proceedings within the relevant time without waiting for the report to be filed, if necessary seeking a stay of proceedings. The characterisation of the period is a matter of case law and must be checked file by file.

Expert appointment in summary proceedings under Article 145 CPC: conditions and new territorial jurisdiction

Article 145 of the French Code of Civil Procedure allows any legally admissible measure of inquiry to be obtained, "if there is a legitimate reason to preserve or establish, before any proceedings, evidence of facts on which the outcome of a dispute may depend", on application or in summary proceedings, at the request of any interested person. For defects in equipment, expert examination is the natural tool: it establishes the reality of the malfunction, its origin, the method of fixing the equipment, the allocation of responsibility among the parties involved and the cost of remedial works. The conditions of the legitimate reason, the framing of the mission and the cost of the measure are dealt with separately in our article on expert appointment in summary proceedings before a construction dispute.

Decree No. 2025-619 of 8 July 2025, in force on 1 September 2025 and applicable only to proceedings commenced from that date, added two paragraphs on territorial jurisdiction. The principle is the applicant's choice between the court likely to hear the case on the merits and the court of the area in which the measure is to be carried out. But the text adds a derogation of direct relevance to construction:

By derogation from the second paragraph, where the measure of inquiry concerns a building, the court of the place where the building is situated has sole jurisdiction.

For a Paris-based investor holding an asset in the regions, the option no longer exists: the application must be brought before the court of the place where the building is situated. Article 2241 does protect an applicant who mistakes the court, since a claim brought before a court lacking jurisdiction interrupts the period. But lost time cannot be made up when the application is made a few weeks before the deadline.

Two precautions complete the application. Bring into the proceedings all the parties who may be pursued, contractors, identified subcontractors, the manufacturer where relevant, and their insurers, the conditions for the measure to be enforceable against them and the extent of the interrupting effect being matters for the courts' assessment. And frame an expert's mission that expressly examines the method of removal of the equipment and the consequences of the defect on the use of the work: the characterisation as ten-year or two-year will depend on these two answers.

After the two-year period has expired

Expiry of the period in Article 1792-3 discharges the builder from the warranties owed under it, by the effect of Article 1792-4-1. It does not, however, close every prospect of action.

Article 1792-4-3 provides that "apart from the actions governed by Articles 1792-3, 1792-4-1 and 1792-4-2, liability actions brought against the builders designated in Articles 1792 and 1792-1 and their subcontractors are time-barred after ten years from acceptance of the works". This residual period exists. Its applicability to a defect in equipment after the two years have elapsed, and the basis of liability then available, call for an analysis of case law that must be carried out in the individual case and cannot be presumed.

In any event, the route of Article 1792 remains where the damage, affecting an item of equipment, renders the work unfit for its purpose: in that configuration, the period is ten years. Hence the value, once again, of characterising early and precisely the functional consequences of the defect, and not merely its material location.

Checkpoints for the purchaser of a recent asset

The two-year warranty is a transferable legal asset. It is lost through inadvertence more often than through forfeiture in litigation. The checks to carry out before signing, on an asset accepted less than two years ago:

  • the exact date of acceptance, package by package and phase by phase, and the corresponding report;
  • the status of reservations and their lifting, with the lifting reports;
  • all the notification letters sent to the contractors since acceptance;
  • the identity of the holders of the technical packages, of the declared subcontractors and of the manufacturers of major equipment;
  • the insurance certificates of the parties involved, distinguishing compulsory ten-year cover from any optional functional warranties;
  • the clauses of the acquisition contract or works contract limiting the warranties, to be checked against Article 1792-5.

For operational real estate complexes, the dividing line in Article 1792-7 must be drawn in the technical documentation itself: what belongs to the building and its equipment, what belongs to the process. Professional equipment falls outside the statutory regime and its protection is negotiated by contract.

One final caveat, concerning restructuring operations. The regime applicable to equipment installed on an existing work, and the question whether the intervention itself constitutes a work, are not settled by any of the texts cited above. The case law of the Third Civil Chamber has shifted on this point. In a heavy renovation or in the replacement of technical installations on an occupied site, the characterisation must be anticipated when the contracts are drafted, and the litigation strategy built on several alternative bases.

Conclusion

The two-year functional warranty is the shortest of the three statutory warranties, the only one that benefits from no compulsory insurance, and the one whose procedural regime carries the greatest uncertainty as to suspension of the period. These three characteristics converge on a single practical conclusion: for equipment, prolonged amicable negotiation is a costly strategy. It consumes the only period available to the client, without producing any interrupting effect, against a debtor whose solvency is guaranteed by no one.

The rule of conduct we recommend is chronological. Notify in writing from the first year, decide between the twelfth and the eighteenth month, and apply to the summary proceedings judge at the latest during the twentieth month where the defect persists. If the file approaches the twenty-fourth month, have the writ for an expert appointment in summary proceedings served before the court of the place where the building is situated without waiting for the outcome of the technical exchanges: Article 2241 protects the claim brought before a court, not correspondence.

Frequently asked questions

Does the two-year warranty run from delivery or from acceptance? From acceptance. Article 1792-3 refers to a minimum duration of two years "from its acceptance". Acceptance is defined by Article 1792-6 as the act by which the client declares that it accepts the work with or without reservations, pronounced on an adversarial basis, by agreement or, failing that, by court order. Delivery to the purchaser, commissioning of the installations or handing the keys to the tenant have no bearing on this starting point. On an operation accepted in phases, each acceptance opens its own period.

Ten-year or two-year: how to decide for faulty equipment? The analysis must follow an order. First Article 1792: if the damage, affecting an item of equipment, renders the work unfit for its purpose, the ten-year liability applies. Then Article 1792-2: if the equipment forms an inseparable whole with the works of services, foundation, framework, enclosure or roofing, that is, if its removal, dismantling or replacement cannot be carried out without damage to or removal of material from that work, the ten-year liability also applies. Failing that, the defect falls under the two-year warranty of Article 1792-3.

Is a formal notice enough to interrupt the period of the two-year warranty? Article 2241 of the French Civil Code refers to a claim brought before a court, even in summary proceedings, as the act interrupting the limitation period and the period of forfeiture. The texts do not give this effect to a letter, even a registered one. A client that relies on a formal notice to preserve its period runs the risk of losing its rights. A writ, including for an expert appointment in summary proceedings, is the act to favour as the deadline approaches.

Does court-ordered expert examination suspend the two-year period? The answer is not secured on a reading of the texts alone. Article 2239 provides for suspension when the judge grants an application for a measure of inquiry made before any proceedings, the period starting to run again "for a period which may not be less than six months, from the day on which the measure was carried out". But this text refers only to limitation, and Article 2220 excludes periods of forfeiture from the title on extinctive limitation, unless the law provides otherwise. The characterisation of the period in Article 1792-3 is therefore decisive and must be checked in case law before building a timetable on the assumption of suspension.

Does property damage insurance cover defects falling under the two-year warranty? Article L. 242-1 of the French Insurance Code refers to damage "of the kind for which builders within the meaning of Article 1792-1, manufacturers and importers or the technical inspector are liable on the basis of Article 1792 of the Civil Code", and takes effect after expiry of the completion warranty. The liability insurance obligation in Article L. 241-1 for its part refers to ten-year liability. Cover for defects falling under Article 1792-3 therefore depends, where applicable, on optional cover whose existence and scope must be checked in the specific conditions of the policies.

Can a purchaser invoke the two-year warranty on a building it has just bought? Yes, subject to the time limit. Article 1646-1 subjects the seller of a building to be constructed, from acceptance of the works, to the obligations of Articles 1792 to 1792-3, and specifies that these warranties benefit successive owners of the building. Article 1792-1, 2°, moreover deems a builder any person who sells, after completion, a work that it built or had built. The period is nonetheless counted from the original acceptance, and not from the acquisition: an asset acquired eighteen months after acceptance leaves only six months for a two-year action.

Is the production equipment of an industrial site covered by the two-year warranty? Not where its exclusive function is to allow a professional activity to be carried on in the work. Article 1792-7 excludes these items of equipment, including their accessories, from the notion of items of equipment of a work within the meaning of Articles 1792, 1792-2, 1792-3 and 1792-4. Their protection depends on the stipulations of the supply and installation contracts. On a logistics or industrial asset, the dividing line between building equipment and process equipment must be fixed when the operation is structured.

The simulator below tells you, from the date of acceptance of the works, which guarantee covers your defect and until when you can act.

Votre situation ressemble-t-elle à celle-ci ?

Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.

Décrire ma situation
Sans engagement – réponse du cabinet sous quarante-huit heures ouvrées.
• Vous êtes concerné ?

Defects that appeared after handover?

One-year completion warranty, two-year warranty, ten-year liability: which one protects you depends on the nature of the defect and the date of handover.

construction
two-year-functional-warranty-art-1792-3-civil-code-equipment-coverage
Questionnaire
×
Merci, votre demande est bien parvenue au cabinet. Une réponse vous sera adressée sous quarante-huit heures ouvrées.
L’envoi n’a pas abouti. Vous pouvez écrire directement à contact@avocats-gloria.com.

Vos réponses aux questions précédentes sont jointes à votre message. Réponse sous quarante-huit heures ouvrées.

Ces questions ne constituent pas une consultation juridique et ne remplacent pas l’examen de vos pièces. Les informations transmises servent uniquement à répondre à votre demande et ne sont pas cédées à des tiers.

← Question précédente

Gloria Avocats, your trusted legal partner

By email or by telephone, the firm will answer all your questions.

• Contact us